Complex Towhead Transport Project
NXGEN have successfully delivered a complex
transport & engineering solution to relocate five
towhead structures from Wick Harbour.
NXGEN was contracted to provide transport and lift plans, as well as a sea fastening design for the transport of steel modules approximately 150Te in weight. The modules were to be transported from the fabrication facility via SPMT, to be lifted by an LR1750 crawler crane onto a waiting coaster vessel for onward transportation.
Due to the design of the modules, it was not possible to attach lashing chains, therefore the sea fastening had to be designed to restrain the modules at the base only. NXGEN completed the sea fastening design and fabrication drawings.
NXGEN have successfully delivered a complex
transport & engineering solution to relocate five
towhead structures from Wick Harbour.
NXGEN have successfully delivered a
transport solution for a series of structural
columns to a refinery site in
NXGEN provided 16 axles of SPMTs
and a PPU to transport two vessels
to a crane located across
Helping and supporting customers within the heavy lift and transport industry is at the heart of our business. If you’ve got a project requirement that we can help with or you’re in need of some expert advice, get in touch today and one of our team members will be on hand to assist.